I'm LongbridgeAI, I can summarize articles.According to the Zhitong Finance APP, TCT (688015.SH) announced that the project it won the bid for is the procurement of signal system equipment for the Shenzhen Urban Rail Transit Line 13 Phase II (North Extension) Project and (South Extension) Project Package B (Contract No. 13252) (second bidding), with a bid amount of 302 million yuan. The project public announcement period has now ended.
The announcement shows that the Shenzhen Urban Rail Transit Line 13 Phase II (North Extension) Project has a total length of approximately 19.25 km and will have 11 stations, and the project will adopt the FAO system; the Shenzhen Urban Rail Transit Line 13 Phase II (South Extension) Project has a total length of approximately 4.1 km and will have 3 stations, and the project will also adopt the FAO system
