I'm LongbridgeAI, I can summarize articles.According to the Zhitong Finance APP, Kaishan Group (300257.SZ) announced that in May 2023, its subsidiary KS ORKA Hungary Kft (referred to as "KSOH") participated in geothermal exploration area application activities organized by the Hungarian Ministry of Energy's Mining Authority. Recently, the authority sent a letter to KSOH, notifying them that they have obtained a geothermal exploration license with registration number SZTFH-BANYASZ/692-6/2025. This license exclusively grants KSOH the geothermal block covering an area of 171 square kilometers and a depth of 250 meters to 3500 meters for geothermal exploration. The Turawell geothermal power station, which was completed and put into operation in 2017, is located within this exploration area.
KSOH will organize a team to begin determining drilling targets and designing drilling engineering plans with the coordination and support of Kaishan Group's headquarters. It is expected that land will be purchased and exploration/production well drilling will take place within the year, followed by the construction of a geothermal power generation capacity of 50-100 megawatts in the Tura area
