
FANGDA S.Steel ultra-high temperature subcritical power generation energy-saving renovation project main plant building topped out
Recently, FANGDA S.Steel's ultra-high temperature subcritical power generation energy-saving and carbon reduction upgrade project main plant has been topped out, marking the official entry of the project into the equipment installation phase. As a key project for FANGDA S.Steel to promote energy structure transformation, this project adopts advanced domestic ultra-high temperature subcritical gas power generation technology. The main construction content includes two 220t/h ultra-high temperature subcritical gas boilers, two 65MW intermediate reheat condensing steam turbines, two 70MW generators, and their supporting auxiliary facilities. Upon completion, the project will significantly enhance the utilization efficiency of surplus energy in the production process, effectively reduce the demand for purchased electricity, and contribute to energy conservation and emission reduction while creating economic benefits

