MVV, Mueller tap ADS-TEC Energy for 39 battery-buffered ultra-fast EV charging stations in Germany
I'm LongbridgeAI, I can summarize articles.ADS-TEC Energy has partnered with MVV and Müller to deploy 39 battery-buffered ultra-fast EV charging stations across 27 German retail sites. MVV will finance, build, and operate the infrastructure using ADS-TEC's ChargePost systems, delivering 250-300 kW charging power via on-site batteries to mitigate grid constraints. Two stations were recently commissioned at Müller’s Härtsfeldcenter in Neresheim as part of this nationwide rollout.
- ADS-TEC Energy joined MVV, Müller in a rollout of battery-buffered ultra-fast EV charging at Müller retail sites across Germany. * MVV will finance, build, operate 39 stations with 78 charging points across 27 locations, using ADS-TEC Energy’s ChargePost systems. * Project targets high-traffic retail sites with limited grid capacity, using on-site batteries to deliver 250-300 kW charging without major grid upgrades. * Two new stations were commissioned at Müller’s Härtsfeldcenter retail park in Neresheim as part of the nationwide buildout. Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. ADS-TEC Energy plc published the original content used to generate this news brief on July 10, 2026, and is solely responsible for the information contained therein. © Copyright 2026 - Public Technologies (PUBT) Original Document: here
